Twellium Biscuit Factory - Ghana

Reputable Food and Beverage Factory in Ghana

Twellium Biscuit Factory

Dalal Steel Industries completes the reputable TWELLIUM Biscuit Factory in Nsawam, Ghana. A factory designed for a state-of the art production line - whereby each floor of the multistory structure is designed to hold 3 tons distributed weight.

The building was structurally designed and manufactured by Dalal Steel Industries using Pre-Engineered Steel Building Technology. With fast production and construction time the building was operational in no time.


Height

20 meters (3 Stories)


Width x Length

95 x 155 meters

Project Location

Nsawam - Ghana 

Materials Used

Rockwool Insulated Cladding System


Covered Area

44,175 m² 

Building usage

Biscuit Factory 


The building was constructed into two phases allowing factory production to start sooner.

A Closer Look

The steel building is 3 stories high and has translucent panels on the façade to allow natural lighting for each floor.      

The Interior

Each floor is designed to take 3 tons weight to with hold the machines and equipment for the production line.

A Birds-Eye View

A beautiful 95 meter façade connecting the two phases and two sections seamlessly.

Speak to a Representative.

Contact our team to find the right solution for you.

Liberia Airport VIP Lounge
Arched Shape Steel and Aluminum Facade